Table 29. Assumptions for Renewable Portfolio Standards and Timing in Four Analyses
|
Study |
RPS Target and Implementation Schedule |
|---|---|
|
EIA, Current Study |
5% by 2005, 10% by 2010, 20% by 2020 |
|
EIA, AEO2000 |
2.4% 2000-2004, increasing to 7.5% by 2010 |
|
UCS |
5% by 2005, 10% by 2010, 20% by 2020 |
|
Tellus |
2% by 2000, 3% by 2005, and 4% by 2010 |
| Sources: EIA, Current Study: National Energy Modeling System, run M2RPS20_x.D070601A. EIA, AEO2000: National Energy Modeling System, run RPS2KFUL.D100699B. UCS: S. Clemmer, A. Nogee, and M. Brower, A Powerful Opportunity: Making Renewable Electricity the Standard (Cambridge, MA: Union of Concerned Scientists, January 1999). Tellus: S. Bernow, W. Dougherty, and M. Duckworth, Quantifying the Impacts of a National, Tradable Renewables Portfolio Standard, The Electricity Journal (May 1997). | |