Table 17. Coal Market Projections in Selected Integrated Cases With No RPS, 2010 and 2020
|
Projection |
1999 |
2010 |
2020 |
||||||
|---|---|---|---|---|---|---|---|---|---|
|
Reference Case |
Integrated Cases |
Reference Case |
Integrated Cases |
||||||
|
NOx, SO2, CO2 1990 |
NOx, SO2, CO2 1990-7% |
NOx, SO2, CO2 1990-7%, Hg |
NOx, SO2, CO2 1990 |
NOx, SO2, CO2 1990-7% |
NOx, SO2, CO2 1990-7%, Hg |
||||
|
Electricity Sector Coal Consumption (Million Tons) |
923 |
1,145 |
694 |
567 |
518 |
1,196 |
554 |
485 |
478 |
|
Total Coal Production |
1,110 |
1,295 |
853 |
724 |
674 |
1,340 |
721 |
641 |
640 |
|
Minemouth Coal Price (1999 Dollars per Ton) |
16.98 |
14.08 |
13.42 |
13.43 |
14.38 |
12.87 |
11.90 |
12.16 |
13.41 |
|
Delivered Coal Price to Generators (1999 Dollars per Million Btu) |
1.22 |
1.06 |
0.95 |
0.91 |
0.93 |
0.98 |
0.85 |
0.82 |
0.85 |
|
Effective Delivered Coal Price to Generatorsa |
1.22 |
1.06 |
3.83 |
4.54 |
3.99 |
0.98 |
4.52 |
4.77 |
4.68 |
|
Scrubber Retrofits |
0 |
7 |
14 |
19 |
21 |
15 |
14 |
19 |
21 |
|
Average Hg Content of Coal (Pounds per Trillion Btu)c |
7.7 |
7.2 |
6.8 |
7.2 |
6.4 |
7.0 |
6.8 |
7.1 |
6.4 |
|
aEffective delivered price reflects the cost impact of CO2 emission allowances in cases that include a CO2 cap. bAn additional 2.7 gigawatts of retrofits are planned during 2000-2002. cModel estimate, calculated by weighting Hg content for each coal supply curve (see Table 6 in Chapter 2) by model estimates of shipments. Source: National Energy Modeling System, runs M2BASE.D060801A, M2NM9008.D060801A, M2NM7B08.D060901A, and M2P7B08. D060801A. |
|||||||||