Errata for the Annual
Energy Outlook 1999
as of 9/9/1999
1. The units on Figure 73 should be "1997 cents per kilowatthour" not "1997
mills per kilowatthour".
(change made on
8/31/1999)
2. The units on Figure 75 should be
"gigawatts" not "megawatts".
(change made on 8/31/1999)
3. The historical
Lower 48 average crude oil wellhead prices for 1996 and 1997 were incorrectly
reported.
The correct prices are as follows:
1996
1997
Lower
48 Average Wellhead Price
(1997 dollars per
barrel)
19.83 not
17.03 18.01
not 16.25
The 1996 price appears in Table A15. The 1997 price appears in Tables A15, B15,
C15, and F12. The wellhead price
growth rate on Table A15 would also
change, since 1997 is the base year for the rate. The new growth rate would
be
0.8 % not 1.3%. Wellhead price growth rates
for the other tables were not published in the printed report but were
provided for Table B15 and Table C15 in
Appendix tables on the Internet. These latter growth rates should be changed as
follows:
Table B15 - High Economic
Growth 1.0 %
not 1.5 %
Table B15 - Low Economic
Growth
0.6 % not 1.0 %
Table C15 - High World Oil
Price
2.0 % not 2.4 %
Table C15 - Low World Oil
Price
-1.2 % not - 0.7 %
(change made on 9/9/99)
4. On
Page 72, in Column 1 - The last sentence should read "Lower capital costs
and projected
improvements in gas turbine heat rates make the
overall cost of gas-generated electricity per kilowatthour
competitive with the cost of electricity from new
coal-burning generators."
(change made on 9/9/99)
5. On Table F5. The word
"end-use" should be removed from the title.
(change made on 9/9/99)
6. Figures 30,
31, and 32
were updated with revised values.
(change made on 9/9/99)