Electricity Market Module
[80] These costs were developed using the National Energy Technology Laboratory Mercury Control Performance and Cost Model, 1998.
[81] U.S. Department of Energy, Analysis of Mercury Control Cost and Performance, Office of Fossil Energy & National Energy Technology Laboratory, January 2003.
Sources referenced in Table 39.
Fossil technology cost and performance characteristics were developed utilizing reviews performed by A2H Energy Services and Booz Allen Hamilton (BAH) in May 2004. A2H and BAH reviewd the parameters utilized in the Annual Energy Outlook 2004 (AEO2004) and provided recommended changes where needed. The averages of the AE2004 values and the recommended values were used.
Aiken, Richard, Booz Allen Hamilton, Review of Fossil Energy Cost and Performance Assumptions in the Electricity Market Module of the National Energy Modeling System, May 2004.
DeLallo, Michael, Independent Expert (PEER) Review Program for the Energy Information Administration, May 17, 2004.
McGraw-Hill Companies, Top Plants, Power Magazine, Vol. 146, No. 5, August 2002.
A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010 (RDNN), available at the following link: http://www.nuclear.gov/Nuclear2010/NucPwr2010_PI.html.
“New Fuel for the CANDU - And a new CANDU, too!”; NUKEM Market Report, June 2002.
|