Energy Information Administration Forecast Channel.  If having trouble viewing this page, contact the National Energy Informaiton Center at (202) 586-8800.
Home >Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis
 


The Electric Transmission Network: A Multi-Region Analysis

Table 7.  Detail of Increased Dispatch at NYPP Plants in the Shoulder Demand Cases

Plant Name

County

Marginal Cost
(1995 Mills per Kilowatthour)

Capacity (Megawatts)

Reference Case Dispatch (Megawatts)

Super Region Case Dispatch (Megawatts)

Additional Dispatch (Megawatts)

Fuel

Astoria

Queens

20.76

1,075

456

668

212

FO6/NG

LG&E-West

Rennsselaer

19.14

104

0

88

88

FO1/NG

Arthur Kill

Richmond

17.61

826

570

783

213

FO6/NG

C R Huntley

Erie

15.85

710

125

423

298

BIT

Rochester 7

Monroe

15.75

260

30

193

163

BIT

Source: AEO2000 National Energy Modeling System runs AEO2K.D100199A and NENY.D050200C.

 

E-Mail Subscription

EIA Home 
Contact Us

Page last modified on
Return to Energy Information Administration Home Page