| |
The Electric Transmission Network: A Multi-Region Analysis
Table
7. Detail of Increased Dispatch at NYPP Plants in the Shoulder Demand
Cases
|
Plant Name
|
County
|
Marginal Cost
(1995 Mills per Kilowatthour)
|
Capacity (Megawatts)
|
Reference Case Dispatch (Megawatts)
|
Super Region Case Dispatch (Megawatts)
|
Additional Dispatch (Megawatts)
|
Fuel
|
|
Astoria
|
Queens
|
20.76
|
1,075
|
456
|
668
|
212
|
FO6/NG
|
|
LG&E-West
|
Rennsselaer
|
19.14
|
104
|
0
|
88
|
88
|
FO1/NG
|
|
Arthur
Kill
|
Richmond
|
17.61
|
826
|
570
|
783
|
213
|
FO6/NG
|
|
C
R Huntley
|
Erie
|
15.85
|
710
|
125
|
423
|
298
|
BIT
|
|
Rochester
7
|
Monroe
|
15.75
|
260
|
30
|
193
|
163
|
BIT
|
|
Source: AEO2000 National Energy Modeling System runs AEO2K.D100199A
and NENY.D050200C. |
E-Mail
Subscription
|