Table 1. TDLOFUS (Ratio - unitless)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| TDLOFUS | 14 | 204 | 0.05867 | 0.0002876 | 0.01696 | 0.8172 | 0.8055 | 1.978 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| PTND_01 | -0.117982 | 0.0041599 | -28.4 | Constant coefficient |
| PTND_17 | 0.008384 | 0.0020218 | 4.15 | D89ON |
| PTND_06 | 0.027174 | 0.0059959 | 4.53 | JAN = 1 if January, 0 otherwise |
| PTND_07 | 0.087132 | 0.0055772 | 15.6 | FEB = 1 if February, 0 otherwise |
| PTND_08 | 0.026833 | 0.0057110 | 4.70 | MAR = 1 if March, 0 otherwise |
| PTND_09 | 0.049169 | 0.0057041 | 8.62 | APR = 1 if April, 0 otherwise |
| PTND_10 | -0.010445 | 0.0057052 | -1.83 | MAY = 1 if May, 0 otherwise |
| PTND_11 | -0.006268 | 0.0057051 | -1.10 | JUN = 1 if June, 0 otherwise |
| PTND_12 | -0.010095 | 0.0057053 | -1.77 | JUL = 1 if July, 0 otherwise |
| PTND_13 | 0.016875 | 0.0057041 | 2.96 | AUG = 1 if August, 0 otherwise |
| PTND_14 | 0.097022 | 0.0057126 | 17.0 | SEP = 1 if September, 0 otherwise |
| PTND_15 | 0.044954 | 0.0056505 | 7.96 | OCT = 1 if October, 0 otherwise |
| PTND_16 | 0.020316 | 0.0060859 | 3.34 | NOV = 1 if November, 0 otherwise |
| TDLOFUS_L1 | -0.138013 | 0.0694200 | -1.99 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1980 through February 1998 |
||||
Table 2. "Other" Electricity Demand, ESOTPUSQ (billion kilowatthours per day per real $GDP)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| ESOTPUSQ | 14 | 168 | 0.0003259 | 1.93974E-06 | 0.0013927 | 0.8315 | 0.8185 | 2.424 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| ESOT_01 | 0.042254 | 0.0009033 | 46.8 | Constant coefficient |
| ESOT_D1 | -0.002870 | 0.0010046 | -2.86 | D90ON |
| ESOT_06 | 0.001257 | 0.0003517 | 3.57 | JAN = 1 if January, 0 otherwise |
| ESOT_07 | 0.003184 | 0.0004612 | 6.90 | FEB = 1 if February, 0 otherwise |
| ESOT_08 | -0.000945 | 0.0005344 | -1.77 | MAR = 1 if March, 0 otherwise |
| ESOT_09 | -0.001031 | 0.0005797 | -1.78 | APR = 1 if April, 0 otherwise |
| ESOT_10 | -0.001300 | 0.0006046 | -2.15 | MAY = 1 if May, 0 otherwise |
| ESOT_11 | 0.001673 | 0.0006125 | 2.73 | JUN = 1 if June, 0 otherwise |
| ESOT_12 | 0.002469 | 0.0006044 | 4.08 | JUL = 1 if July, 0 otherwise |
| ESOT_13 | 0.002671 | 0.0005796 | 4.61 | AUG = 1 if August, 0 otherwise |
| ESOT_14 | 0.003468 | 0.0005350 | 6.48 | SEP = 1 if September, 0 otherwise |
| ESOT_15 | 0.0000535 | 0.0004638 | 0.12 | OCT = 1 if October, 0 otherwise |
| ESOT_16 | 0.0000764 | 0.0003472 | 0.22 | NOV = 1 if November, 0 otherwise |
| ESOTPUSQ_L1 | 0.854837 | 0.0435200 | 19.6 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1983 through February 1998 |
||||
Table 3. Electricity Generated by Wood and Waste, WWEOPUS (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| WWEOPUS | 14 | 144 | 0.0000348 | 2.41568E-07 | 0.0004915 | 0.7630 | 0.7416 | 2.094 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| WWEO_01 | 0.004694 | 0.0002681 | 17.5 | Constant coefficient |
| WWEO_D1 | 0.000825 | 0.0002931 | 2.81 | D90ON |
| WWEO_06 | -0.000166 | 0.0001454 | -1.14 | JAN = 1 if January, 0 otherwise |
| WWEO_07 | -0.000371 | 0.0001877 | -1.98 | FEB = 1 if February, 0 otherwise |
| WWEO_08 | -0.000488 | 0.0002152 | -2.27 | MAR = 1 if March, 0 otherwise |
| WWEO_09 | -0.000735 | 0.0002312 | -3.18 | APR = 1 if April, 0 otherwise |
| WWEO_10 | -0.000980 | 0.0002396 | -4.09 | MAY = 1 if May, 0 otherwise |
| WWEO_11 | -0.000495 | 0.0002422 | -2.04 | JUN = 1 if June, 0 otherwise |
| WWEO_12 | -0.000202 | 0.0002394 | -0.84 | JUL = 1 if July, 0 otherwise |
| WWEO_13 | 0.000136 | 0.0002310 | 0.59 | AUG = 1 if August, 0 otherwise |
| WWEO_14 | 0.00000885 | 0.0002155 | 0.04 | SEP = 1 if September, 0 otherwise |
| WWEO_15 | 0.0000571 | 0.0001895 | 0.30 | OCT = 1 if October, 0 otherwise |
| WWEO_16 | 0.0000493 | 0.0001445 | 0.34 | NOV = 1 if November, 0 otherwise |
| WWEOPUS_L1 | 0.749697 | 0.0578100 | 13.0 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1985 through February 1998 |
||||
Table 4. Residential Electricity Demand, ESRCPUSQ (Billion kilowatt-hours/day/household)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| ESRCPUSQ | 19 | 115 | 0.0000368 | 3.20163E-07 | 0.0005658 | 0.9779 | 0.9744 | 1.917 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| ESRC_01 | 0.021193 | 0.0004819 | 44.0 | Constant coefficient |
| ESRC_03 | 0.000208 | 0.0000293 | 7.11 | ZWHDPUS*(OCT...APR) |
| ESRC_04 | 0.000889 | 0.0001022 | 8.70 | ZWCDPUS*(MAY...SEP) |
| ESRC_031 | 0.000202 | 0.0000295 | 6.83 | LAG(ZWHD*(OCT...APR)) |
| ESRC_041 | 0.000552 | 0.0001022 | 5.41 | LAG(ZWCD*(MAY...SEP)) |
| ESRC_05W | 0.0000210 | 0.00000209 | 10.1 | Winter Trend |
| ESRC_05S | 0.0000309 | 0.00000258 | 12.0 | Summer trend |
| ESRC_06 | 0.004011 | 0.0002211 | 18.1 | JAN = 1 if January, 0 otherwise |
| ESRC_07 | 0.002926 | 0.0002555 | 11.45 | FEB = 1 if February, 0 otherwise |
| ESRC_08 | -0.001676 | 0.0002561 | -6.54 | MAR = 1 if March, 0 otherwise |
| ESRC_09 | -0.004277 | 0.0002519 | -17.0 | APR = 1 if April, 0 otherwise |
| ESRC_10 | -0.007861 | 0.0007007 | -11.2 | MAY = 1 if May, 0 otherwise |
| ESRC_11 | -0.003616 | 0.0007064 | -5.12 | JUN = 1 if June, 0 otherwise |
| ESRC_12 | 0.000951 | 0.0007106 | 1.34 | JUL = 1 if July, 0 otherwise |
| ESRC_13 | 0.001254 | 0.0007111 | 1.76 | AUG = 1 if August, 0 otherwise |
| ESRC_14 | -0.001211 | 0.0007081 | -1.71 | SEP = 1 if September, 0 otherwise |
| ESRC_15 | -0.004379 | 0.0002426 | -18.0 | OCT = 1 if October, 0 otherwise |
| ESRC_16 | -0.003945 | 0.0002163 | -18.2 | NOV = 1 if November, 0 otherwise |
| ESRCPUSQ_L1 | 0.268438 | 0.09038 | 2.97 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1987 through February 1998 |
||||
Table 5. Commercial Electricity Demand, ESCMPUSQ (Billion kilowatt-hours/day/employee)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| ESCMPUSQ | 19 | 115 | 0.0000116 | 1.01289E-07 | 0.0003183 | 0.9840 | 0.9815 | 2.053 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| ESCM_01 | 0.015073 | 0.00148 | 10.2 | Constant coefficient |
| ESCM_02L | 0.000103 | 0.0000143 | 7.23 | TIME = 1 to n, where n = number of observation (LINEAR) |
| ESCM_02Q | -0.000000201 | 0.000000034 | -5.98 | TIME = 1 to n, where n = number of observation (QUADRATIC) |
| ESCM_04 | 0.0000889 | 0.0000164 | 5.43 | ZWHDPUS*(OCT...APR) |
| ESCM_041 | 0.0000497 | 0.0000164 | 3.02 | LAG(ZWHD*(OCT...APR)) |
| ESCM_05 | 0.000486 | 0.0000572 | 8.49 | ZWCDPUS*(MAY...SEP) |
| ESCM_051 | 0.000139 | 0.0000572 | 2.44 | LAG(ZWCD*(MAY...SEP)) |
| ESCM_06 | 0.001114 | 0.0001198 | 9.30 | JAN = 1 if January, 0 otherwise |
| ESCM_07 | 0.002091 | 0.0001443 | 14.5 | FEB = 1 if February, 0 otherwise |
| ESCM_08 | -0.000602 | 0.0001476 | -4.08 | MAR = 1 if March, 0 otherwise |
| ESCM_09 | -0.000710 | 0.0001469 | -4.83 | APR = 1 if April, 0 otherwise |
| ESCM_10 | -0.000617 | 0.0001472 | -4.19 | MAY = 1 if May, 0 otherwise |
| ESCM_11 | 0.003254 | 0.0001486 | 21.9 | JUN = 1 if June, 0 otherwise |
| ESCM_12 | 0.004776 | 0.0001492 | 32.0 | JUL = 1 if July, 0 otherwise |
| ESCM_13 | 0.004978 | 0.0001476 | 33.7 | AUG = 1 if August, 0 otherwise |
| ESCM_14 | 0.004357 | 0.0001439 | 30.3 | SEP = 1 if September, 0 otherwise |
| ESCM_15 | 0.000751 | 0.0001363 | 5.51 | OCT = 1 if October, 0 otherwise |
| ESCM_16 | -0.000260 | 0.0001159 | -2.24 | NOV = 1 if November, 0 otherwise |
| ESCMPUSQ_L1 | 0.398874 | 0.08585 | 4.65 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1987 through February 1998 |
||||
Table 6. Electricity Generated by Geothermal Power, GEEOPUS (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| GEEOPUS | 3 | 131 | 0.0004027 | 3.07399E-06 | 0.0017533 | 0.9027 | 0.9012 | 2.101 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| GEEO_01 | -2.558274 | 0.11737 | -21.8 | Constant coefficient |
| GEEO_02 | -0.006276 | 0.0005890 | -10.6 | TIME = 1 to n, where n = number of observation |
| GEEOPUS_L1 | 0.666502 | 0.06429 | 10.4 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1987 through February 1998 |
||||
Table 7. Electricity Generated by Wind, Solar, and Other, WNEOPUS (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| WNEOPUS | 14 | 60 | 2.39245E-09 | 3.9874E-11 | 6.3146E-06 | 0.9300 | 0.9148 | 2.347 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| WNEO_01 | 0.00000571 | 0.00000317 | 1.80 | Constant coefficient |
| WNEO_D1 | 8.04504 | 6.57244 | 1.22 | D9505ON |
| WNEO_06 | -0.000000008 | 0.000000411 | -0.02 | JAN = 1 if January, 0 otherwise |
| WNEO_07 | 0.000000384 | 0.000000622 | 0.62 | FEB = 1 if February, 0 otherwise |
| WNEO_08 | 0.00000175 | 0.00000149 | 1.18 | MAR = 1 if March, 0 otherwise |
| WNEO_09 | 0.00000357 | 0.00000275 | 1.29 | APR = 1 if April, 0 otherwise |
| WNEO_10 | 0.00000487 | 0.00000370 | 1.32 | MAY = 1 if May, 0 otherwise |
| WNEO_11 | 0.00000610 | 0.00000456 | 1.34 | JUN = 1 if June, 0 otherwise |
| WNEO_12 | 0.00000667 | 0.00000496 | 1.35 | JUL = 1 if July, 0 otherwise |
| WNEO_13 | 0.00000550 | 0.00000410 | 1.34 | AUG = 1 if August, 0 otherwise |
| WNEO_14 | 0.00000436 | 0.00000327 | 1.33 | SEP = 1 if September, 0 otherwise |
| WNEO_15 | 0.00000241 | 0.00000187 | 1.29 | OCT = 1 if October, 0 otherwise |
| WNEO_16 | 0.000000483 | 0.000000559 | 0.86 | NOV = 1 if November, 0 otherwise |
| WNEOPUS_L1 | 0.758753 | 0.08616 | 8.81 | 1st-order autocorrelation correction parameter |
| Method of estimation: OLS with 1st-order autocorrelation correction Estimation period: January 1992 through February 1998 |
||||
Table 8. Industrial Electricity Demand, ESICPUS (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| ESICPUS | 18 | 80 | 0.05203 | 0.0006503 | 0.02550 | 0.9699 | 0.9635 | 1.511 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| ESIC_01 | 1.434574 | 0.06774 | 21.2 | Constant coefficient |
| ESIC_Q | 0.569114 | 0.07018 | 8.11 | ZOMNIUS |
| ESIC_Q2 | 0.510327 | 0.12640 | 4.04 | ZO26IUS |
| ESIC_H1 | 0.004958 | 0.00169 | 2.93 | HDD DEVS |
| ESIC_C1 | 0.008916 | 0.00519 | 1.72 | CDD DEVS |
| ESIC_D1 | 0.031070 | 0.00900 | 3.45 | D92 |
| ESIC_D2 | 0.029912 | 0.00940 | 3.18 | D94 |
| ESIC_06 | -0.014955 | 0.01251 | -1.20 | JAN = 1 if January, 0 otherwise |
| ESIC_07 | 0.191429 | 0.01252 | 15.3 | FEB = 1 if February, 0 otherwise |
| ESIC_08 | 0.005148 | 0.01289 | 0.40 | MAR = 1 if March, 0 otherwise |
| ESIC_09 | 0.067403 | 0.01306 | 5.16 | APR = 1 if April, 0 otherwise |
| ESIC_10 | 0.082838 | 0.01302 | 6.36 | MAY = 1 if May, 0 otherwise |
| ESIC_11 | 0.241383 | 0.01304 | 18.5 | JUN = 1 if June, 0 otherwise |
| ESIC_12 | 0.152588 | 0.01300 | 11.7 | JUL = 1 if July, 0 otherwise |
| ESIC_13 | 0.227527 | 0.01298 | 17.5 | AUG = 1 if August, 0 otherwise |
| ESIC_14 | 0.239165 | 0.01297 | 18.4 | SEP = 1 if September, 0 otherwise |
| ESIC_15 | 0.131305 | 0.01297 | 10.1 | OCT = 1 if October, 0 otherwise |
| ESIC_16 | 0.111625 | 0.01342 | 8.32 | NOV = 1 if November, 0 otherwise |
| Method of estimation: OLS Estimation period: January 1990 through February 1998 |
||||
Table 9. Electricity Generated by Coal, CLEOPUSX (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| CLEOPUSX | 20.5 | 64.5 | 0.10487 | 0.0016258 | 0.04032 | 0.9919 | 0.9894 | 1.946 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| CLEO_0 | -0.173943 | 0.34074 | -0.51 | Constant term |
| CLEO_CL | -0.579139 | 0.13077 | -4.43 | Coeff. of (CLEUDUS/RFEUDUS) |
| CLEO_NG | 0.230324 | 0.05697 | 4.04 | Coeff. of (NGEUDUS/RFEUDUS) |
| CLEO_E | 0.627153 | 0.02499 | 25.09 | Coeff. of ELEOPUS |
| CLEO_EW | 0.172859 | 0.03305 | 5.23 | Coeff. For incremental impact of ELEOPUS in fall/winter compared to spring/ |
| CLEO_N | -0.605199 | 0.08631 | -7.01 | Coeff. Of NUEOPUS |
| CLEO_H | -0.521804 | 0.15964 | -3.27 | Coeff. Of HYEOPUS |
| CLEO_HP | -0.572061 | 0.14345 | -3.99 | Coeff. Of HYEOPAC |
| CLEO_G | -2.012668 | 2.46882 | -0.82 | Coeff. of GEEOPUS |
| CLEO_01 | -0.016996 | 0.01994 | -0.85 | JAN = 1 if January, 0 otherwise |
| CLEO_02 | 0.000508 | 0.02442 | 0.02 | FEB = 1 if February, 0 otherwise |
| CLEO_03 | -0.045807 | 0.03908 | -1.17 | MAR = 1 if March, 0 otherwise |
| CLEO_04 | -0.059558 | 0.05048 | -1.18 | APR = 1 if April, 0 otherwise |
| CLEO_05 | 1.159463 | 0.26624 | 4.35 | MAY = 1 if May, 0 otherwise |
| CLEO_06 | 1.205182 | 0.27500 | 4.38 | JUN = 1 if June, 0 otherwise |
| CLEO_07 | 1.181284 | 0.28013 | 4.22 | JUL = 1 if July, 0 otherwise |
| CLEO_08 | 1.181764 | 0.27712 | 4.26 | AUG = 1 if August, 0 otherwise |
| CLEO_09 | 1.184012 | 0.26574 | 4.46 | SEP = 1 if September, 0 otherwise |
| CLEO_10 | -0.065772 | 0.03748 | -1.76 | OCT = 1 if October, 0 otherwise |
| CLEO_11 | -0.009261 | 0.02467 | -0.38 | NOV = 1 if November, 0 otherwise |
| CLEOPUSX_L1 | 0.537806 | 0.10566 | 5.09 | 1st-order autocorrelation correction parameter |
| Method of estimation: Iterated Seemingly Unrelated Regressions (SUR) with 1st-order autocorrelation correction (jointly with NGEOPUSX) Estimation period: January 1991 through January 1998 |
||||
Table 10. Electricity Generated by Natural Gas, NGEOPUSX (billion kilowatthours per day)
| Equation | DF Model | DF Error | SSE | MSE | Root MSE | R-Square | Adj R-Sq | Durbin-Watson |
| NGEOPUSX | 20.5 | 64.5 | 0.09556 | 0.0014816 | 0.03849 | 0.9782 | 0.9716 | 2.042 |
| Parameter | Estimate | Approx. Std. Err. | 'T' Ratio | Label |
| NGEO_0 | 0.519723 | 0.30769 | 1.69 | |
| NGEO_NG | -0.255480 | 0.05393 | -4.74 | |
| NGEO_E | 0.290337 | 0.02382 | 12.2 | |
| NGEO_EW | -0.197862 | 0.03087 | -6.41 | |
| NGEO_N | -0.136031 | 0.08023 | -1.70 | |
| NGEO_H | -0.144970 | 0.15049 | -0.96 | |
| NGEO_HP | -0.452389 | 0.12875 | -3.51 | |
| NGEO_G | -4.455987 | 2.33792 | -1.91 | |
| NGEO_01 | -0.027836 | 0.01875 | -1.48 | JAN = 1 if January, 0 otherwise |
| NGEO_02 | -0.031234 | 0.02239 | -1.39 | FEB = 1 if February, 0 otherwise |
| NGEO_03 | 0.065746 | 0.03648 | 1.80 | MAR = 1 if March, 0 otherwise |
| NGEO_04 | 0.115073 | 0.04749 | 2.42 | APR = 1 if April, 0 otherwise |
| NGEO_05 | -1.305135 | 0.24912 | -5.24 | MAY = 1 if May, 0 otherwise |
| NGEO_06 | -1.373434 | 0.25775 | -5.33 | JUN = 1 if June, 0 otherwise |
| NGEO_07 | -1.361641 | 0.26263 | -5.18 | JUL = 1 if July, 0 otherwise |
| NGEO_08 | -1.337162 | 0.25976 | -5.15 | AUG = 1 if August, 0 otherwise |
| NGEO_09 | -1.329916 | 0.24847 | -5.35 | SEP = 1 if September, 0 otherwise |
| NGEO_10 | 0.146385 | 0.03521 | 4.16 | OCT = 1 if October, 0 otherwise |
| NGEO_11 | 0.058146 | 0.02333 | 2.49 | NOV = 1 if November, 0 otherwise |
| NGEOPUSX_L1 | 0.471363 | 0.11047 | 4.27 | 1st-order autocorrelation correction parameter |
|
Method of estimation: Iterated Seemingly Unrelated Regressions (SUR) with 1st-order autocorrelation correction (jointly with CLEOPUSX) |
||||
File last modified: August 13, 1998
This page's URL: http://www.eia.doe.gov/emeu/steo/pub/document/regrel.html
If you are having technical problems with this site, please contact the EIA Webmaster at wmaster@eia.doe.gov.