|
||||||||||||||||||||||||||||||||||||
|
Unit 1 Nuclear system supplied by General Electric Company
(U.S.) |
|||||
|---|---|---|---|---|---|
Capacity Net MW(e) |
Generation in 2003 Megawatthours |
Capacity
Factor |
Type |
On-Line Date |
License Expiration Date |
1,130 |
9,276,766 |
93.5
% |
BWR |
April 17, 1982 |
April 17, 2022 |
|
Unit 2 Nuclear system supplied by General Electric Company (U.S.) |
|||||
Capacity Net MW(e) |
Generation in 2003 Megawatthours |
Capacity
Factor |
Type |
On-Line Date |
License Expiration Date |
1,130 |
9,139,213 |
92.1
% |
BWR |
Dec. 16, 1983 |
Dec. 16, 2023 |
Sources: Capacity, for purposes of this report, is the net summer capability as reported in Energy Information Administration (EIA) survey form 860, "Annual Electric Generator Report." Capacity Factor is a calculation in which the maximum possible generation (based on net summer capability) is divided into the actual generation than multiplied by 100 to get a percentage. Generation is the electricity output reported by plant owners on EIA survey form 906. Type of Unit: All U.S. commercial reactors currently in operation are one of two types: BWR (boiling water reactor) or PWR (pressurized light water reactor). The type is identified in EIA's Nuclear Power
Generation and Fuel Cycle Report. Both the On-line Date and the License Expiration Date are reported annually in Information Digest by the U.S. Nuclear Regulatory Commission.
Contact:
Plants A - L
Plants M - Z