Home > Electricity > EIA 411 > Form EIA-411 Database

Form EIA-411 - “Coordinated Bulk Power Supply Program Report” Data

Peak Load, Monthly Peak Hour Demand, and Net Energy for Load


Release Date: February 07, 2008
Next Release Date: October 2008

Peak Load

The maximum load during a specified period of time.

 

Monthly Peak Hour Demand

The maximum load during an integrated specified hour of time for the month of greatest electrical generation during the winter season (December-February) and summer season (June-September), respectively. Or, for each of the twelve calendar months.

Net Energy For Load

Net generation of main generating units that are system-owned or system-operated, plus energy receipts minus energy deliveries.


Contact: