Table 15.   Summary Information on Approved and Planned Independent System Operators as of March 31, 1998
  California
ISO
ERCOT
Texas ISO
ISO New
England
MidWest ISO
(MISO)
New York ISO Pennsylvania,
New Jersey,
Maryland
(PJM)-ISO
DesertStar Independent
Grid Operator
(IndeGO)
Midcontinent
Area Power
Pool (MAPP)
Southwest
Power Pool (SPP)
Alliance ISO
Status Conditionally approved by FERC. Start date March 31, 1998. Approved by the Texas PUC and operating. Conditionally approved by FERC. Partially operating. Submitted FERC filing January 1998. Currently under review. Submitted FERC filing December 1997. Currently under review. Conditional approval by FERC. Start date April 1998. FERC application under development. Expected filing date unknown. In March 1998, IndeGO officially suspended further development. Its future is uncertain. FERC application under development. FERC filing in late May 1998. Under discussion. Under discussion.
States Covered California Texas Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont Illinois, Indiana, Kentucky, Missouri, Ohio, Maryland, Pennsylvania, Virginia, West Virginia, Wisconsin New York, New Jersey Delaware, New Jersey, Maryland, Pennsylvania, Washington, DC, Virginia Arizona, Nevada, New Mexico, Texas Northwest Region Iowa, Kansas, Minnesota, Missouri, Montana, Nebraska, South Dakota, Wisconsin Louisiana, Arkansas, Oklahoma, Texas, Kansas, Missouri Michigan, Ohio, Virginia, West Virginia
Number of Transmission Owners 3 16 15 13 8 10 7 Undecided 19 11 3
Type of Organization Nonprofit Nonprofit Nonprofit Nonprofit Nonprofit Nonprofit Nonprofit Nonprofit Under development Under development Under development
Board of Directors 24 members representing 13 stakeholder classes 18 members representing 6 stakeholder classes 10 independent members 8 independent members 10 independent members 8 independent members Undecided 7 independent members Under development Under development Under development
Control Areas Single Multiple Single Multiple Single Single Multiple Multiple Multiple Multiple Multiple
Transmission Facilities Controlled by the ISO Facilities still undefined. TOs will physically operate. Not controlled by the ISO. 69 kV and above. TOs physically operate. 60 kV and above. TOs physically operate. 115 kV and above. TOs physically operate. 230 kV and above. 230 kV and above; TOs physically operate. 230 kV and above; TOs physically operate. Under development. Under development. Under development.
Transmission Rights Program Under development (due 6/30/98) None Under development Undecided Transmission congestion contracts Fixed transmission rights Undecided Under development Unknown Unknown Unknown
Transmission Congestion Charges Two active congestion zones. Charges based on adjustment bids submitted by power suppliers. Under development Charges based on costs of redispatch, will be paid by all loads on a load ratio share. Charges based on cost of redispatch, will be spread among all loads. Based on the difference in locational marginal prices of energy (LMP). Zones represent locations. Customers at the location pay the charges. Based on the difference in locational marginal prices of energy (LMP). 1600 nodes represent locations. Customers at the location pay the charges. Under development. 26 congestion zones. Charges based on adjustment bids submitted by power suppliers. Unknown. Unknown. Unknown.
Transmission Access Charges (Method to Meet Revenue Requirements) Based on area where customer withdraws power from the grid (similar to zone pricing). ISO does not have a regional transmission tariff. A five-year phase-in of a regional postage stamp charge. One charge based on the zone where the customer withdraws power from the grid. Each control area is a zone. One charge based on the zone where the customer withdraws power from the grid. Seven zones defined. One charge based on the zone where the customer withdraws power from the grid. Ten zones defined. Under development. Based on the zone where the customer withdraws power. 26 zones defined. Based on megawattmile for coordination transactions. Based on megawattmile for short-term point-to-point services. Under development.
Ancillary Services ISO procures if not provided ISO coordinates ISO can provide ISO will arrange for services ISO can provide. ISO provides or coordinates ISO will provide after phase-in ISO will provide or coordinate as necessary Under development Under development Under development
Transmission Planning ISO leads coordinated process ISO coordinates NEPOOL has lead role ISO develops plan with transmission owners ISO is an active participant ISO prepares plan Under discussion ISO has primary planning responsibility. Under discussion Under discussion Under discussion
Power Exchange Separate PX No PX ISO and PX combined No PX Separate PX ISO and PX combined No PX No PX Plan to establish power and energy market Unknown Unknown

   TO = Transmission Owner.
   Notes: The information contained in this table summarizes complicated subjects in one or two sentences. A summary is used to present an overview, but it may leave out important details. For more detail, see information sources shown below. Conditional approval means that the ISO needs to resolve or clarify issues raised by the FERC about founding documents, organizations, or other matters.
   Sources: California ISO: Federal Energy Regulatory Commission, "Order Conditionally Authorizing Limited Operation of an Independent System Operator and Power Exchange," www.caiso.com (October 30, 1997); ERCOT-Texas ISO: www.ercot.com (October 30, 1997); New England ISO: Federal Energy Regulatory Commission, "Order Conditionally Authorizing Establishment of an Independent System Operator," Docket No. EC97-35-000, www.iso.ne.com (June 25, 1997); Midwest ISO: www.midwestiso.com (January 1998); New York ISO: "Supplemental Filing to the Comprehensive Proposal to Restructure the New York Wholesale Electric Market," www.nypowerpool.com (December 24, 1997); PJM-OI: Federal Energy Regulatory Commission "Order Conditionally Accepting Open Access Transmission Tariff and Power Pool Agreements, Conditionally Authorizing Establishment of an Independent System Operator," www.pjm.com (November 25, 1997); DesertStar: www.swrta.com (January 1998); IndeGO: www.idahopower.com/ipindego1.htm (March 1998); MAPP: www.mapp.com (January 1998); SPP: www.spp.com (January 1998); Alliance ISO: www.ferc.fed.us/online/rims.htm (March 1998).