Released December 2002
(Next Release:
November 2003)

NEMS Models
Other EIA Models
NEMS Contacts

Download the entire report in PDF format

Related Links

Forecasts Publications
EIA Publications

Levelized Nuclear Fuel Cycle Cost Model (LNFCC-PC)

Description:

LNFCC-PC computes an electric utility's levelized nuclear fuel cost. The code computes quantities of fuel-cycle services and levelized direct costs, which include the carrying charges accounting for the time value of money. All fuel-cycle services from natural uranium purchased through waste disposal are covered.

Last Model Update:

April 1990

Part of Another Model?

No

Sponsor:

  • Office: Office of Integrated Analysis and Forecasting
  • Division: Coal and Electric Power Division
  • Model Contact: Laurence Sanders
  • Telephone: (202) 586-2049
  • E-Mail Address: Laurence.Sanders@eia.doe.gov

Documentation:

  • Energy Information Administration, Levelized Nuclear Fuel-Cycle Cost Model User's Guide, MDR/ES/81 (Washington, DC, June 1982)
  • Energy Information Administration, Levelized Nuclear Fuel-Cycle Cost (LNFCC-PC) Lotus 1-2-3 Spreadsheet Documentation, Installation and Operating Instructions, Laurence Sanders (Washington, DC, April 1986).

Archive Media and Installation Manual(s):

  • LNFCC86
    • Annual Energy Outlook 1986
  • LNFCC90
    • Annual Energy Outlook 1990.

Coverage:

  • Geographic: Constrained to light water reactors (LWRs) United States and foreign
  • Time Unit/Frequency: As needed for annual reports
  • Product(s): Nuclear fuel costs
  • Economic Sector(s): Electric utilities.

Modeling Features:

  • Model Structure: Equations described in model documentation
  • Modeling Technique: Deterministic
  • Special Features: Lotus 1-2-3 electronic spreadsheet.

Non-DOE Input Sources:

  • NUEXCO, Monthly Report on the Nuclear Fuel Market (Denver, CO)
    • Uranium price
    • Conversion price
    • Fabrication price
    • Enrichment price
    • Unit cost of waste disposal
  • DRI, Utility Cost of Finance for Debt, Preferred Equity, and Common Equity
    • Utility cost of capital
    • Lag for revenue collection
  • Standard and Poor's Compustat Services, Inc., The Compustat Tapes, Denver, CO, and subsequent releases
    • Utility cost of capital
    • Lag for revenue collection.

DOE Data Input Sources:

Forms and Publications:

  • Energy Information Administration, World Nuclear Fuel-Cycle Requirements, DOE/EIA-0436
    (Washington, DC, September 1988)
    • Thermal rating of nuclear plant
    • Electrical ratings
    • Cycle length
    • Full power days per cycle
    • Fresh fuel assay
    • Discharge burnup
    • Batch fraction
    • Process loss
    • Lead time

Models and Other:

  • Office of the Assistant Secretary for Nuclear Energy, Office of the Deputy Assistant Secretary for Uranium Enrichment
    • Enrichment contracting terms (base enrichment price, VTAO surcharge, enrichment tails assay).

Computing Environment:

  • Hardware Used: IBM-compatible personal computer
  • Operating System: MS-DOS
  • Language/Software Used: Lotus 1-2-3, Version 1.0
  • Memory Requirement: 640 Kb
  • Storage Requirement: 27 Kb
  • Estimated Run Time: On an IBM AT, 30-40 CPU seconds
  • Special Features: Interactive.